Pre-Construction. To be built. Brand new builder owned 3/2.5 two story townhome with estimated completion date of August 2024. CBS construction with full builder warranties. Terrific plan featuring large great room, extensive ceramic tile flooring, solid surface tops in kitchen, refrigerator, blinds, 10x14 patio and much, much more.
O6156042
Condo, Townhouse, Contemporary, 2 Story, Townhouse
3
Polk
2 Full/1 Half
2024
0.07
Acres
Public
2
Stucco
Public Sewer
Loading...
Data Provided by Onboard
Walk Score measures the walkability of any address, Transit Score measures access to public transit on a scale of 1-100.
Walk Score
Transit Score
Data Provided by Walk Score
Loading...