Pre-Construction. To be built. Brand new Maronda Homes Avella V3 plan with estimated completion date of Dec 2024. CBS construction with fullbuilder warranties. Terrific plan featuring large great room, solid surface tops in kitchen, extensive ceramic tile flooring, refrigerator and much, much more.
O6201167
Single Family, Contemporary, 1 Story
3
Volusia
2 Full
2024
0.17
Acres
Public
1
Block,Stone,Stucco
Public Sewer
Loading...
Data Provided by Onboard
Walk Score measures the walkability of any address, Transit Score measures access to public transit on a scale of 1-100.
Walk Score
Transit Score
Data Provided by Walk Score
Loading...