Pre-Construction. To be built. PRE-CONSTRUCTION home by Gibraltar Contracting. Construction of this home will commence after executing a contract with home buyer. Approximate building time is from 9 months to 12 months. All contracts require a 3% contingency for overages. This pine wooded lot is located in O'Brien, providing serenity and privacy. Photos provided are from matching floor plan and represent standard finishes including have high end vinyl plank flooring, luxury lighting, and granite countertops upgraded trim package, all wood / non mdf cabinets. *Photos are NOT the actual home but a matching plan by same builder and represent finishes offered.
GC514889
Single Family, 1 Story
4
Suwannee
2 Full
2023
4.94
Acres
Well
1
Fiber cement
None, Septic Tank
Loading...
Data Provided by Onboard
Walk Score measures the walkability of any address, Transit Score measures access to public transit on a scale of 1-100.
Walk Score
Transit Score
Data Provided by Walk Score
Loading...